Case Study Mirage machines

WELD SEAM REMOVAL

willhartshorn Case Studies, Linear Milling Leave a Comment

REQUIREMENTS

Removal of a longitudinal weld seam to allow fitting of a ‘Morgrip’ connector.

LOCATION

Apache North Sea, Forties Delta.

SOLUTION:

– Use of the Mirage MR1500SS milling rail

– Workshop trials carried out in advance.

OUTCOME:

Successful machining allowed fitting of the ‘Morgrip’ mechanical connector.

Workshop trail. / Subsea cutting operation.

Leave a Reply