REQUIREMENTS
Removal of a longitudinal weld seam to allow fitting of a ‘Morgrip’ connector.
LOCATION
Apache North Sea, Forties Delta.
SOLUTION:
– Use of the Mirage MR1500SS milling rail
– Workshop trials carried out in advance.
OUTCOME:
Successful machining allowed fitting of the ‘Morgrip’ mechanical connector.
Workshop trail. / Subsea cutting operation.